Brief
Bazy was in charge to dismantle an old VW system and install a new system with 52 Cubes 50” and undertakes the full responsibility to keep NOC Display System – video wall solution running as per customer expectations. All tickets are handled and solved on time as per the agreed SLA depending on its severity. A dedicated engineer is available on site/call along to give the needed support and provide all reports about system status and actions done. Shown below is the VW architecture and an SLA example,